Project Case Studies

L&J Engineering can provide Project Management for your engineering project. Get in touch to find out how we can reduce the strain on your resource.

Project Case Studies

L&J Engineering have run hundreds of projects over the last 15 years. Our case studies represent just a few of the projects, with more to be added from time to time.

Mabey Bridge Wind Turbine Facility

Project Description

Supply & Installation of 18” Gas Main. Pipework was designed and calculated in house. L&J installed a new plastic main pipe in the ground up to the new building. L&J manufactured the new 12 metre lengths of pipework and fitted it up into and through the new building to the ovens at far end of the building, 160 metres distance away. L&J supplied and fitted all new isolation valves and carried out certification of the line when completed.

Project Details

Client Mabey Bridge

Site Chepstow

Project Date May, 2011

Project / Service Pipework Installation

Industry Sector Manufacturing (Engineering)